Works
01
Public Facilities / Office Building
Contents
Works 01
06Tsu Sanko Building
Main Environmental and Social Considerations:
Roof garden, solar power, Low-e glass, light shelf for making use of daylight, second floor horizontal eaves to cut sunlight, self-cleaning top-coat on exterior materials, LED/high efficiency lighting , simplified airflow method for the perimeter, use of high COP air circulation system, use of rainwater, revised Rationalization in Energy Use Law compliant building management system
- Location
- Mie
- Client (owner)
- Sanko Real Estate CO., LTD.
- Year of Completion
- 2011
- TFA
- 7,199 m2
- Structure / No. of floors
- Steel / 8 stories with 1 basement level